Hydro Mobile

Water Treatment Facility

Wasco installs 60lb glazed block over 7ft to 8ft #8 rebar for water treatment facility. The rebar had many areas there were doubled up in every core and the guys were very thankful for having the MULEs to allow them to focus on improving wall quality and not struggling to get the block over and down the rebar. Hydro Mobile 64’ bridge setup. MULEs are spaced extra far to cover the critical areas with the tallest rebar and have the gaps be where windows and lighter block work would be.

Inner Banner

Project Name

Water Treatment Facility

Contractor

WASCO

Architect

Architect

Project Type

Commercial

Material

12" CMU

Location

Knoxville, TN

Year

2025

Products

MZ100

MZ100

GROUND BASE

GROUND BASE