Hydro Mobile
Water Treatment Facility
Wasco installs 60lb glazed block over 7ft to 8ft #8 rebar for water treatment facility. The rebar had many areas there were doubled up in every core and the guys were very thankful for having the MULEs to allow them to focus on improving wall quality and not struggling to get the block over and down the rebar. Hydro Mobile 64’ bridge setup. MULEs are spaced extra far to cover the critical areas with the tallest rebar and have the gaps be where windows and lighter block work would be.

Project Name
Water Treatment Facility
Contractor
WASCO
Project Type
Commercial
Material
12" CMU
Location
Knoxville, TN
Year
2025
Products

MZ100

GROUND BASE
Videos