ROI

Enter your information below to calculate the ROI

Labor Rates
Mason Hourly RateLabor Hourly Rate
25
15
Production (Per Mason Per Day)
Blocks per mason per day
100
Blocks per mason per day with MULE
120
32" Blocks per mason per day w/ MULE
100
Crew Scenarios (A / B / C)
Crew SizeWeekly Rate EachWeekly Rate TotalCrew SizeWeekly Rate EachWeekly Rate TotalCrew SizeWeekly Rate EachWeekly Rate Total
Mason
3
$1,000$3,000
3
$1,000$3,000
3
$1,000$3,000
Labor
3
$600$1,800
3
$600$1,800
3
$600$1,800
Weekly Total Labor Cost$4,800Weekly Total Labor Cost$4,800Weekly Total Labor Cost$4,800
Weekly Block Production for Crew1,500Weekly block production for crew1,800Weekly block production for crew3,000
Labor Cost Per Block$3.20Labor Cost Per Block$2.67Labor Cost Per Block$1.60
Savings When Using the MULE:Savings Per Block: $$0.53Savings Per Block: $$1.60
Savings Per Month: $$3,840Savings Per Month: $$19,200
Scenario C doubles weekly output (same as your original script).

Build smarter, faster, and safer.

Reach out to speak with a Construction Robotics team member about bringing the MULE MZ100 to your jobsite.

Build smarter, faster, and safer.

Reach out to speak with a Construction Robotics team member about bringing the MULE MZ100 to your jobsite.

Build smarter, faster, and safer.

Reach out to speak with a Construction Robotics team member about bringing the MULE MZ100 to your jobsite.
Field

The business of construction is changing. Let's build smart.

Whether you’re a contractor, foreman, mason, labor, we’re here to support your goals with solutions for your next project.

Field

The business of construction is changing. Let's build smart.

Whether you’re a contractor, foreman, mason, labor, we’re here to support your goals with solutions for your next project.

Field

The business of construction is changing. Let's build smart.

Whether you’re a contractor, foreman, mason, labor, we’re here to support your goals with solutions for your next project.